濟南水穩(wěn)攪拌站有沒有正確的設備規(guī)劃?
來源:http://m.guixin.net.cn/ 日期:2022-03-31
水穩(wěn)攪拌站常用于公路、橋梁等工程的施工中,該設備生產(chǎn)效率高,自動化程度高,連續(xù)生產(chǎn)能力強。所以設備規(guī)劃方面的安排一定要做好,這樣才能發(fā)揮出設備效能。那么濟南水穩(wěn)攪拌站有沒有正確的設備規(guī)劃?
Water stable mixing plant is often used in the construction of highway, bridge and other projects. The equipment has high production efficiency, high degree of automation and strong continuous production capacity. Therefore, the arrangement of equipment planning must be done well, so as to give play to the efficiency of equipment. So jinan Shuiwen mixing station has the correct equipment planning?
根據(jù)當?shù)氐耐恋厥褂镁唧w情況,做好科學的安置,包括設備的配料機、水泥罐等相關設備的具體位置,保證產(chǎn)品通道的前提下,選址是非常重要的,大家一定要做好相關的規(guī)劃。
According to the specific situation of local land use, do a good job of scientific resettlement, including the specific location of equipment batching machine, cement tank and other related equipment, on the premise of ensuring the safe passage of products, site selection is very important, we must do a good job of relevant planning.
確定好攪拌站跟石料場的位置,然后根據(jù)攪拌機的位置做好服務器的位置,然后根據(jù)橫縱坐標,明確斜帶支腿、斜帶尾框支腿等相關的定位點。根據(jù)斜帶支腿、斜帶尾框支腿等中心的位置做好基坑的挖掘,明確好相關的土層狀況。
First determine the position of mixing station and stone field, and then according to the position of the mixer to do the position of the server, and then according to the horizontal and vertical coordinates, clear oblique with legs, oblique with tail frame legs and other related loci. Excavate the foundation pit according to the position of the center of the slant leg and the slant tail frame leg, and make sure the soil condition.
確保機器設備的正常工作運行,減少設備出現(xiàn)故障的幾率。儲水箱跟井的位置要距離攪拌站近一些,保證水的用量。然后根據(jù)設備的相關情況,做好設備的排水工作。
Ensure the normal operation of machines and equipment, reduce the probability of equipment failure. The location of the storage tank with the well should be close to the mixing station to ensure the amount of water. Then according to the relevant situation of the equipment, do the drainage work of the equipment.
另外,濟南水穩(wěn)攪拌站完工之后,再重新安裝或者拆卸都是沒那么簡單的,所以就需要客戶在安裝的時候做好相應的規(guī)劃,確保設備安裝之后減少拆卸的可能,要找經(jīng)驗豐富的技術人員做好相應的方案。
In addition, after the completion of ji 'nan water stability mixing station, re-installation or disassembly is not so simple, so it is necessary for customers to do a good job in the installation of the corresponding planning, to ensure that after the installation of equipment to reduce the possibility of disassembly, to find experienced technicians to do the corresponding scheme.
市場上水穩(wěn)攪拌站的生產(chǎn)廠家有很多,設備的原材料也因廠家不同而不同,要的兩種原材料是鋼材、皮帶和電器件,根據(jù)不同的需求選擇不同的鋼材、皮帶和電氣元件,把好原料的采購進廠關,須選擇正規(guī)企業(yè)生產(chǎn)、而且市場大多使用口碑好的國標產(chǎn)品,質(zhì)量檢驗檢測認證等證書必須齊全。
Market stable water mixing plant manufacturers have a lot of, the equipment of raw materials also varies by manufacturer, to the two kinds of raw material is steel, belt and electric parts, choose according to different requirements of different steel, belts and electrical components, the procurement of raw materials into the factory, the good must select normal enterprise production, and market are mostly use word of mouth good national standard products, The certificate such as quality inspection and detection attestation must be all ready.
針對濟南水穩(wěn)攪拌站的相關問題還有很多,如果您有興趣的話,歡迎您來http://m.guixin.net.cn這里咨詢了解!
There are many related problems in Ji 'nan Water Stability mixing station. If you are interested, you are welcome to come to http://m.guixin.net.cn to consult and understand!