行業(yè)資訊
裝載機(jī)走合磨合期要注意什么細(xì)節(jié)?
來(lái)源:http://m.guixin.net.cn/ 日期:2022-04-23
裝載機(jī)的主要作用便是裝卸搬運(yùn)各種物品,作用大效果不錯(cuò),所以在市場(chǎng)中越來(lái)越受歡迎,那么要想更好的使用機(jī)器工作就要多多去了解它,比如從問(wèn)題開(kāi)始了解,裝載機(jī)走合磨合期要注意什么細(xì)節(jié)?
The main role of loader is loading and unloading and handling various items, the effect is good, so it is more and more popular in the market, so in order to better use the machine to work, we must learn more about it, such as starting from the problem, what details should be paid attention to during the loader run-in?
使用機(jī)器前,請(qǐng)仔細(xì)閱讀裝載機(jī)手冊(cè),并注意手冊(cè)中的每一項(xiàng)注意事項(xiàng);在運(yùn)行和關(guān)閉過(guò)程中,每個(gè)檔位的前進(jìn)檔和倒檔應(yīng)均勻布置;在磨合期內(nèi),裝載重量不得超過(guò)額定載荷的70%;注意機(jī)器的潤(rùn)滑,在規(guī)定的時(shí)間更換或添加潤(rùn)滑油。
Before using the machine, please read the loader manual carefully and pay attention to each item in the manual. In the process of running and closing, the forward and reverse gears of each gear should be evenly arranged; During the run-in period, the loading weight shall not exceed 70% of the rated load; Pay attention to the lubrication of the machine, change or add lubricating oil at the specified time.
裝載機(jī)須時(shí)刻注意變速箱、變矩器、前后橋、輪轂和制動(dòng)鼓的溫度。若有過(guò)熱現(xiàn)象,應(yīng)查明原因并排除;磨合期以裝載松散物料為宜,不宜過(guò)于猛烈或過(guò)于倉(cāng)促;檢查電氣系統(tǒng)各部件的溫度及接線(xiàn)情況,發(fā)電機(jī)供電狀態(tài),照明等工作情況。
The loader must always pay attention to the temperature of the gearbox, torque converter, front and rear axle, hub and brake drum. If there is overheating, the cause should be identified and eliminated; Run-in period to load loose materials is appropriate, should not be too violent or too hasty; Check the temperature and wiring condition of electrical system components, power supply status of generator, lighting and other working conditions.
濟(jì)南裝載機(jī)租賃人員認(rèn)為檢查幾個(gè)關(guān)鍵部件(發(fā)動(dòng)機(jī)、軸箱、輪輞、傳動(dòng)軸等)螺栓螺母的緊固情況很是重要;磨合期滿(mǎn)后,清洗變速箱油底殼濾清器,更換新油;并更換發(fā)動(dòng)機(jī)油和驅(qū)動(dòng)油。
Ji 'nan loader rental personnel think that a comprehensive inspection of several key components (engine, axle box, rim, drive shaft, etc.) bolt and nut fastening situation is very important; After running in, clean the filter of gearbox oil pan and replace the new oil; And change the engine oil and drive oil.
另外,裝載機(jī)工作時(shí),很多司機(jī)習(xí)慣于一邊換檔一邊利用機(jī)器高速運(yùn)轉(zhuǎn)的慣性沖向料堆,利用行駛的慣性沖樁,會(huì)使整機(jī)受到嚴(yán)重沖擊,各部位受力不均,對(duì)整機(jī)造成很大傷害,這會(huì)導(dǎo)致鏟斗、動(dòng)臂、前車(chē)架等變形、開(kāi)裂;變速箱和離合器會(huì)因突然受力而扭曲變形,扭矩增大,摩擦片容易打滑;傳動(dòng)部件也容易損壞,因此使用時(shí)的方法方式正確。
In addition, when the loader is working, many drivers are used to change gears while using the inertia of the machine at high speed to rush to the pile. Using the inertia of the driving pile, the whole machine will be severely impacted, and the uneven force on all parts will cause great damage to the whole machine, which will lead to the deformation and cracking of the bucket, boom and front frame. Gearbox and clutch will be distorted by sudden force, torque increases, friction plate is easy to slip; Transmission parts are also easy to damage, so the method of use is correct.
裝載機(jī)走合磨合期要注意什么細(xì)節(jié)?以上便是問(wèn)題的相關(guān)內(nèi)容講解了,如果您對(duì)此有疑問(wèn)或者想了解更多關(guān)于該機(jī)器設(shè)備內(nèi)容的話(huà),就來(lái)網(wǎng)站m.guixin.net.cn咨詢(xún)看看吧!
What details should be paid attention to in the run-in period of the loader? The above is the related content of the problem, if you have questions about this or want to know more about the content of the machine equipment, please come to the website m.guixin.net.cn to consult and see!