麻豆国产一区,91偷怕国产,国产a一久久伴,三级片库

歡迎訪問(wèn)永誠(chéng)廣建公路材料(山東)有限公司網(wǎng)站!

永誠(chéng)廣建公路材料(山東)有限公司

熱線電話

15165180688

您現(xiàn)在所在的位置 :首頁(yè) - 新聞中心 > 行業(yè)資訊

行業(yè)資訊

濟(jì)南水穩(wěn)料施工時(shí)注意事項(xiàng)

來(lái)源:http://m.guixin.net.cn/ 日期:2022-05-18
水穩(wěn)料主要由粒料和灰漿體積組成。由水泥、石灰、石膏等膠凝材料加水拌合而成的漿狀混合料,用于粉刷或灌縫。那么濟(jì)南水穩(wěn)料施工時(shí)注意事項(xiàng)是什么呢?
Water stabilized material is mainly composed of granular material and mortar volume. A slurry mixture made of cement, lime, gypsum and other cementitious materials mixed with water, which is used for painting or joint filling. So what are the precautions for the construction of water stabilized materials in Jinan?
攪拌設(shè)備的選擇
Selection of mixing equipment
攪拌設(shè)備的好壞直接影響到混合料的攪拌質(zhì)量,而攪拌設(shè)備質(zhì)量好壞的關(guān)鍵在于能否保證骨料、粉料、水等物料的混合比例精度。本標(biāo)段采用WBC300型穩(wěn)定土植物攪拌設(shè)備。設(shè)備采用電磁調(diào)速系統(tǒng),能更好地保證各種物料的混合比,混合均勻,性能穩(wěn)定。
The quality of mixing equipment directly affects the mixing quality of mixture, and the key to the quality of mixing equipment is whether to ensure the mixing proportion accuracy of aggregate, powder, water and other materials. Wbc300 stabilized soil plant mixing equipment is used in this bid section. The equipment adopts electromagnetic speed regulation system, which can better ensure the mixing ratio of various materials, uniform mixing and stable performance.
嚴(yán)格控制水泥用量
Strictly control the amount of cement
水泥用量過(guò)少,水泥穩(wěn)定土的施工質(zhì)量得不到保證;用量太大不經(jīng)濟(jì),而且會(huì)增加和擴(kuò)大基層裂縫,從而在瀝青面層造成相應(yīng)的反射裂縫。因此,必須嚴(yán)格控制水泥用量,做到經(jīng)濟(jì)合理,精益求精,確保工程質(zhì)量。
Too little cement is used, and the construction quality of cement stabilized soil can not be guaranteed; It is uneconomical to use too much, and it will increase and expand the cracks in the base course, resulting in corresponding reflection cracks in the asphalt surface course. Therefore, the cement consumption must be strictly controlled to achieve economic rationality, keep improving and ensure the project quality.
混合物的水分控制
Moisture control of mixture
在工廠拌合現(xiàn)場(chǎng),后院的專職測(cè)試人員會(huì)在上午、中午和下午分別測(cè)量各種骨料的含水率,根據(jù)根據(jù)施工配合比設(shè)計(jì)的含水率指標(biāo),結(jié)合氣溫,當(dāng)天的濕度和運(yùn)輸距離。
At the factory mixing site, full-time testers in the backyard will measure the moisture content of various aggregates in the morning, noon and afternoon respectively. According to the best moisture content index designed according to the construction mix proportion, combined with the temperature, humidity and transportation distance of the day.
濟(jì)南水穩(wěn)料
這種情況決定了混合混合物時(shí)要使用的水量。前院負(fù)責(zé)測(cè)試壓實(shí)度的專職測(cè)試人員在攤鋪成型混合料的過(guò)程中也及時(shí)測(cè)量混合料的含水量,并指導(dǎo)壓路機(jī)及時(shí)碾壓,所以盡量在含水率條件下滾動(dòng),盡量避免。
This determines the amount of water to be used when mixing the mixture. The full-time tester in charge of testing the compactness in the front yard also measures the water content of the mixture in time during the paving of the formed mixture and guides the roller to roll in time. Therefore, try to roll under the condition of the best water content and avoid it as much as possible.
因含水量過(guò)大而產(chǎn)生“彈性”和“波浪”現(xiàn)象,混合料可能達(dá)到密度和強(qiáng)度,增加混合料的干縮,使結(jié)構(gòu)層容易出現(xiàn)干縮裂縫;或由于含水量低,使混合料容易松散,不易卷成形狀,也影響混合料可能的密度和強(qiáng)度。因此,只有嚴(yán)格按照規(guī)范施工,加強(qiáng)各個(gè)施工環(huán)節(jié)的質(zhì)量控制,才能保證施工質(zhì)量。
The phenomenon of "elasticity" and "wave" due to excessive water content, the mixture may reach density and strength, increase the dry shrinkage of the mixture, and make the structural layer prone to dry shrinkage cracks; Or due to low water content, the mixture is easy to loose and not easy to roll into shape, which also affects the possible density and strength of the mixture. Therefore, the construction quality can be guaranteed only if the construction is carried out in strict accordance with the specifications and the quality control of each construction link is strengthened.
減少混合物的離析
Reduce segregation of mixture
混合物的運(yùn)輸應(yīng)避免車輛碰撞。氣溫高、運(yùn)輸距離長(zhǎng)時(shí),應(yīng)蓋好氈布,以防水分過(guò)度流失。攤鋪和碾壓時(shí),攤鋪系數(shù)在1.3∽1.5之間,濟(jì)南水穩(wěn)料施工中必須貫徹“低不刮”,所有建設(shè)項(xiàng)目應(yīng)在水泥終凝時(shí)間前完成。滾壓后立即進(jìn)行密實(shí)度測(cè)試,如果測(cè)試結(jié)果不符合標(biāo)準(zhǔn),重新滾壓。
The transportation of the mixture shall avoid vehicle collision. When the temperature is high and the transportation distance is long, the felt cloth shall be covered to prevent excessive loss of water. During paving and rolling, the paving coefficient shall be between 1.3 and 1.5. The "low without scraping" must be implemented in the construction of water stabilized materials in Jinan, and all construction projects shall be completed before the final setting time of cement. The compactness test shall be carried out immediately after rolling. If the test result does not meet the standard, it shall be rolled again.
濟(jì)南水穩(wěn)料施工時(shí)注意事項(xiàng)就講解到這里完畢了,當(dāng)然還有很多方面的事項(xiàng)以及細(xì)節(jié)需要大家去認(rèn)真操作,更多信息獲取您可以關(guān)注我們的網(wǎng)站m.guixin.net.cn
This is the end of the explanation of the precautions for the construction of water stabilized materials in Jinan. Of course, there are many matters and details that need to be carefully operated. For more information, you can pay attention to our website m.guixin.net.cn com。
  • 上一條:高溫環(huán)境下壓路機(jī)的操作說(shuō)明
  • 下一條:下大雨對(duì)路面鋪水泥穩(wěn)定碎石層有影響
  • 相關(guān)產(chǎn)品:

    相關(guān)新聞:

    亚洲无码AV一区二区三区| 亚洲有无码V欧洲无码| a在线观看| 操小呦呦视频| 亚洲欧美sun| 女女同性女同一区二区三区| 97影院国产伦理精品| 色5综合| 亚洲天堂一区| 蜜芽国精产品网站| 色噜噜天堂9色av| 少妇无码视频| 亚洲激情99| 亚洲AV无码片区一区二区三区| 日本少妇三级| 精品久久久久国产精品| 狠狠色综合久久久久尤物| 蜜桃污视频网站| 浮V影院亚洲| 天天躁狠狠夜躁2020| 国产精品流白浆| 国产精品中文字幕电影| 亚洲a∨精品一区二区三区下载| 午夜久久精品福利视频| 67194日韩熟妇在线进入| 五十路中文字幕在线| 禁片麻豆| 美女流白浆| 99ren精品| 久综合在线| 亚洲AV无码专区在线亚| 业余性别自由成熟视频| 色综合五月网| 亚州中文字幕无码中文字幕| 久久免费妇女| 欧日韩亚影院| 国产午夜鲁丝片AV无码| 丁香六月七月婷婷| 国产特级毛片AAAAAA毛片| 日韩视频无码我不卡| 大型黄色网站在线观看|