麻豆国产一区,91偷怕国产,国产a一久久伴,三级片库

歡迎訪問永誠廣建公路材料(山東)有限公司網(wǎng)站!

永誠廣建公路材料(山東)有限公司

熱線電話

15165180688

您現(xiàn)在所在的位置 :首頁 - 新聞中心 > 行業(yè)資訊

行業(yè)資訊

整理的一些攪拌站的多面建站流程

來源:http://m.guixin.net.cn/ 日期:2022-06-22
隨著建  清場(chǎng)場(chǎng)地選好后,用挖掘機(jī)表面雜物及淤泥,并運(yùn)指定場(chǎng)地堆放。場(chǎng)地選擇在場(chǎng)地開挖前做好坡頂截水溝,并視土質(zhì)情況做好防滲工作。場(chǎng)地開挖必須按自上而下開挖,不得亂挖、超挖及欠挖,開挖場(chǎng)地頂面時(shí)應(yīng)注意預(yù)留碾壓沉降高度,當(dāng)遇到石方時(shí),采用破碎錘施工。
After the construction site is selected, the sundries and sludge on the surface shall be removed by excavator and transported to the designated site for stacking. For site selection, the intercepting ditch on the slope top shall be completed before site excavation, and the anti-seepage work shall be done according to the soil conditions. The site excavation must be conducted from top to bottom. Random excavation, over excavation and under excavation are not allowed. When excavating to the top of the site, attention shall be paid to the reserved rolling settlement height. When encountering rock, the crushing hammer shall be used for construction.
開挖設(shè)計(jì)標(biāo)高后,碾壓密實(shí)平整,達(dá)不到承載力要求的采用片石換填。排水?dāng)嚢枵緢?chǎng)地在平整場(chǎng)地和硬化場(chǎng)地時(shí),總體控制向兩側(cè)設(shè)置排水,設(shè)置-3%的縱坡,場(chǎng)地內(nèi)四周設(shè)置40×40排水溝,保證場(chǎng)內(nèi)排水通暢。
After excavation to the design elevation, it shall be compacted and leveled. If the bearing capacity cannot be reached, it shall be replaced with rubble. When leveling and hardening the site of the drainage mixing plant, the overall control is to set drainage to both sides, with -3% longitudinal slope, and 40 × 40 drainage ditch to ensure smooth drainage in the site.
濟(jì)南水穩(wěn)攪拌站
六個(gè)料倉在硬化場(chǎng)地時(shí)做單外5%的排水坡,使料倉的水直通過場(chǎng)地縱坡排入到排水溝;攪拌站主機(jī)排水必須設(shè)置沉淀池,以便清洗攪拌機(jī)廢棄水沉淀后在排入排水溝。場(chǎng)地外設(shè)置60×40排水溝。NO.04場(chǎng)地硬化
When the six silos harden the site, they shall be provided with a single 5% drainage slope, so that the water from the silos can be directly discharged into the drainage ditch through the longitudinal slope of the site; The main machine drainage of the mixing plant must be provided with a sedimentation tank so that the waste water from the mixer can be discharged into the drainage ditch after sedimentation. Off site setting 60 × 40 drainage ditch. No.04 site hardening
級(jí):1m片石+0.3m水穩(wěn)層+0.2mC25混凝土;第二、三級(jí):0.3m水穩(wěn)層+0.2mC25混凝土。NO.05攪拌站、料倉基礎(chǔ)攪拌站、料倉基礎(chǔ)用樁承式,承臺(tái)尺寸為5×5×1m,每個(gè)承臺(tái)下設(shè)置4根直徑1.2m的樁基,樁嵌入中風(fēng)化巖層不小于4m,采用C30混凝土澆注。
Level I: 1m rubble +0.3m water stable layer +0.2mc25 concrete; Grade II and III: 0.3m water stable layer +0.2mc25 concrete. No.05 mixing plant, silo foundation mixing plant and silo foundation are of pile supported type, and the bearing platform size is 5 × five × 1m. Four pile foundations with a diameter of 1.2m are set under each bearing platform. The pile is embedded into the moderately weathered rock stratum for not less than 4m, and C30 concrete is used for pouring.
料倉料場(chǎng)布置在攪拌站主機(jī)的后側(cè),共分為6個(gè)料倉,二個(gè)砂倉,四個(gè)石料倉,分料倉隔墻采用“37”墻砌筑高度不小于1.8m,并用水泥砂漿抹面,倉內(nèi)地面設(shè)置5%的地面坡度,分料倉隔墻下預(yù)留孔洞,避免積水。
The silo yard is arranged at the rear side of the main machine of the mixing plant, which is divided into 6 silos, two sand silos and four stone silos. The partition wall of the silo is constructed with "37" wall with a height of not less than 1.8m and plastered with cement mortar. The ground inside the silo is set with a 5% ground slope. Holes are reserved under the partition wall of the silo to avoid ponding.
各種料倉區(qū)域劃分清楚,設(shè)置材料標(biāo)示牌,尺寸40*750px,標(biāo)明材料名稱、產(chǎn)地、規(guī)格、計(jì)量單位、質(zhì)量狀況等。在料倉邊上安裝水管,以便在砂石料被污染的前提下沖洗。
The areas of various silos shall be clearly divided, and material signboards with a size of 40*750px shall be set to indicate the name, origin, specification, unit of measurement, quality status, etc. of the materials. Water pipes shall be installed at the edge of the silo to wash the sand and stone materials if they are contaminated.
濟(jì)南水穩(wěn)攪拌站采取封閉式管理,根據(jù)現(xiàn)場(chǎng)實(shí)際情況,四周砌磚墻圍閉,采用24墻,高2m,每隔6m間距砌筑一個(gè)磚柱,磚柱頂部進(jìn)行帶帽。在進(jìn)出口設(shè)置門衛(wèi)室,并懸掛生成及質(zhì)量方面的標(biāo)語,并插上彩旗。場(chǎng)內(nèi)施工設(shè)置標(biāo)識(shí)牌。
Jinan water stability mixing plant adopts closed management. According to the actual situation of the site, it is surrounded by 24 brick walls with a height of 2m. A brick column is built every 6m, and the top of the brick column is capped. A guard room shall be set at the entrance and exit, with slogans on safety generation and quality hung and colored flags inserted. Signboards shall be set up for on-site construction.
以上就是今天為大家分享的關(guān)于問題的相關(guān)內(nèi)容,希望對(duì)大家能有所幫助,想要了解更多內(nèi)容可以電話聯(lián)系我們或者關(guān)注我們的網(wǎng)站http://m.guixin.net.cn。筑、公路等市場(chǎng)的發(fā)展需求,混凝土攪拌站越來越廣泛的被應(yīng)用,以下整理的一些攪拌站的建站流程,希望對(duì)大家有所幫助。
The above is the relevant content about the problem shared for you today. I hope it can help you. If you want to know more, you can contact us by phone or follow our website http://m.guixin.net.cn 。 Due to the development needs of construction, highway and other markets, concrete mixing plants are more and more widely used. The following sorting out the construction process of some mixing plants, hoping to help you.
  • 上一條:防水瀝青材料的種類講解四種
  • 下一條:壓路機(jī)與傳統(tǒng)光面壓路機(jī)相比有什么優(yōu)勢(shì)?
  • 相關(guān)產(chǎn)品:

    相關(guān)新聞:

    AV网站在线大全| 无码人妻丰满熟妇区69| 无码视频专区| 五月综合色五月| 中文字幕无码97| a2020v天堂| 66mAV在线观看| 亚洲精品一久久| 国产理论无码| 小说淫乱激情欧美激情| 国产伊人操逼| A级一级特级大片| 国产免费高清视频在线一区二区| 天天射天天干黄色网站| 国产色呦呦一级片| 无码天堂网| 日韩精品免费一区二区三区97| 久久久国际| 一起草官网在线观看| 三级亚洲美洲字幕| 亚洲AV夜夜| 国产成熟女人性满足视频| 国产视频啪啪啪啪啪| 欧美天堂一区二区| 久久人妻www| 又黄又大又粗又骚又色| 精品视频999| 高中生a级视频| 色窝一区| 国产精品天干天干在线综合| 久久久精久精品| 亚洲无码一区在线| 久久亚洲少妇| H色视频在线观看| 国产又黄又大又粗又长| 亚洲日韩Av网| 5月丁香6月婷婷| 国产激情久久久久影院小草| 草草视院网址| 日韩男女在线视频观看| 日韩专区在线|