麻豆国产一区,91偷怕国产,国产a一久久伴,三级片库

歡迎訪問永誠廣建公路材料(山東)有限公司網(wǎng)站!

永誠廣建公路材料(山東)有限公司

熱線電話

15165180688

您現(xiàn)在所在的位置 :首頁 - 新聞中心 > 行業(yè)資訊

行業(yè)資訊

攤鋪機(jī)使用施工中的注意事項

來源:http://m.guixin.net.cn/ 日期:2022-09-19
在攤鋪機(jī)開始施工之前,應(yīng)該先做一系列檢查,確定大型路面機(jī)器設(shè)備沒有問題方可開始正常作業(yè),那么攤鋪機(jī)在運行的過程中,我們需要具備怎樣的特殊技術(shù)要求呢?下面濟(jì)南攤鋪機(jī)出租廠家一起來看看出租攤鋪機(jī)之后施工中的注意事項吧:
Before the construction of the paver, a series of inspections should be carried out to ensure that the large road machinery and equipment are free of problems before normal operation. What special technical requirements do we need to have during the operation of the paver? Now let's take a look at the precautions in the construction after renting the paver from Jinan Paver Rental Factory:
(1)按照施工的嚴(yán)格要求,合理確定攤鋪機(jī)出租之后的工作速度、攤鋪寬度、攤鋪厚度、刮板輸送器及螺旋分料器轉(zhuǎn)速、斗門開度等技術(shù)參數(shù)。
(1) According to the strict requirements of construction, reasonably determine the working speed, paving width, paving thickness, speed of scraper conveyor and spiral distributor, bucket door opening and other technical parameters of the paver after lease.
(2)機(jī)械在傳動的瀝青混合料攤鋪機(jī)機(jī),換檔一定須在攤鋪機(jī)完全停止時進(jìn)行,并嚴(yán)禁用力掛檔。
(2) For asphalt mixture paver driven by machinery, gear shifting must be carried out when the paver is completely stopped, and it is strictly prohibited to shift gears forcibly.
(3)準(zhǔn)備卸料時,攤鋪機(jī)推輪靠近自卸車后輪,自卸車掛空檔。攤鋪機(jī)同時推動兩個。
(3) When preparing for unloading, the pusher of the paver is close to the rear wheel of the dump truck, and the dump truck is in neutral. The paver pushes both at the same time.
(4)攤鋪機(jī)的所有部件和系統(tǒng),必要時應(yīng)及時協(xié)調(diào)和校正。運行速度應(yīng)保持穩(wěn)定,停車和啟動次數(shù)應(yīng)盡量減少,以保持設(shè)備的連續(xù)和平衡運行。
(4) All components and systems of the paver shall be timely coordinated and corrected when necessary. The running speed shall be kept stable, and the number of stops and starts shall be minimized to maintain the continuous and balanced operation of the equipment.
濟(jì)南攤鋪機(jī)出租
(5)嚴(yán)禁操作人員在設(shè)備作業(yè)時離開駕駛臺,無關(guān)人員不得在作業(yè)時上、下設(shè)備,或在駕駛臺上停留。
(5) It is strictly forbidden for operators to leave the bridge during equipment operation, and irrelevant personnel shall not get on or off the equipment or stay on the bridge during operation.
(6)攤鋪機(jī)轉(zhuǎn)場后若是在行駛的過程中,禁止在坡道上換檔,或空檔下坡滑行。攤鋪作業(yè)前20-40min,對熨平板進(jìn)行預(yù)熱,使其接近瀝青混合料的攤鋪溫度;因故暫停作業(yè)時,使用預(yù)熱系統(tǒng)進(jìn)行保溫,防止熨平板冷卻;用電預(yù)熱時,應(yīng)先啟動發(fā)動機(jī)。
(6) After the paver is transferred, if it is driving, it is forbidden to shift gears on the ramp or slide downhill in neutral. 20-40min before paving, preheat the screed to make it close to the paving temperature of asphalt mixture; When the operation is suspended for some reason, the preheating system shall be used for heat preservation to prevent the screed from cooling; When preheating with electricity, start the engine first.
此外清潔攤鋪機(jī),除去攤鋪機(jī)表面堆積的泥塊、粘沙和瀝青等;發(fā)動機(jī)、液壓元件和其他部件表面上的塵土、油垢。注意,切勿將污物弄進(jìn)各加油口和空氣濾清器內(nèi)。更多注意事項就來我們網(wǎng)站http://m.guixin.net.cn咨詢吧!
In addition, the paver shall be cleaned to remove the mud lumps, sticky sand and asphalt accumulated on the surface of the paver; Clean the dust and oil dirt on the surface of the engine, hydraulic components and other components. Be careful not to get dirt into the oil filler and air filter. More notes on our website http://m.guixin.net.cn Consult!
  • 上一條:水穩(wěn)和混凝土的區(qū)別
  • 下一條:修路用的瀝青到底是什么
  • 相關(guān)產(chǎn)品:

    相關(guān)新聞:

    欧美一级免费高清视频| 久久精品国产99国产精品导航| 找一个顶级黄色毛片看| 原纱央莉精品区在线看AV| 欧美一区二区三区久久| 日韩色的| 亚洲AV研究所| 亚洲AV午夜福利精品一区| 久久久久久久大香蕉| 亚洲夜夜操天天操| 免费国产小视频| 一区二区日韩欧| 国产乱xxxx国语对白| 丁香五月缴情久久| 久久久久久无码午夜精品| 老扒久久| 中文字幕黄视频| 人妻诱惑| 亚洲无码专区一区二区| 九九综合网| 国产欧洲亚洲黄色大片| 青青草AV线路| 色妞色综合久久夜夜| 床上视频永久免费| 久久久久久久久88| 国产精品成人观看视频国产奇米| 另类伊人天堂| 色播六月婷婷| 爱人若爱其身| 日韩国产精品亚洲А∨天堂免| 久久一牛影视| 日韩AV成人电影无码| 四虎影音| 亚洲激情小说网站| 国产自慰一区二区三区| 香港三级片国产精品| 亚洲av无码专区电影在线观看| 国产精品泄火老熟女| 图片区小说区亚洲区| 4虎影视新地址| 亚洲一线产区二线产区区别在 |